NEC Express5800/GT110e-S Instalační příručka Strana 74

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 275
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 73
3. Setting Up Windows Server 2008 R2
press5800/GT-110e, GT-110e-S, R110e-1E Installation Guide (Windows)
74
Chapter 1 Installing Windows
Tips
After creating a team, if the teaming adapter displays like the following image,
perform steps 8 through 14 again and correct the LiveLink settings.
17. Restart the system.
18. After the system starts, start Broadcom Control Suite by clicking the Broadcom Control Suite icon in
Control Panel, and confirm that a team has been created. Confirm the team settings on the Information
window to the right.
Smart Load Balancing and Failover (without Standby Member)
Smart Load Balancing (Auto-Failback Disable) (with Standby Member)
Team setup is now complete.
Zobrazit stránku 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 274 275

Komentáře k této Příručce

Žádné komentáře